Home
Profile
News
Operation Project
Announcement Notice
Company News
Industry News
Development
Environment
Facilities
Qualicications
Product
Steel structure products
Envelope Products
Assembly decoration integrated window assembly parapet
Industrial door assembled canopy electric lighting smoke exhaust skylight
Team
Management
Projects
Contact Us
Language
中文
English
Announcement
Commitment to environmental requirements for stakeholders
Environmental protection is now every company production, activities and services must consider the issue. We recognize that, together with other economic organizations, it is our common responsibility and obligation to conserve resources, protect the environment and prevent environmental pollution. In line with the prevention of pollution, we strive to seek the road of sustainable development, so that our environment can be continuously improved, and the responsibilities and obligations entrusted to enterprises by the society can be fulfilled.
2023
08-19
Annual output of 300000 square meters of light steel structure assembly decoration integration building production and research and development project environmental impact report before approval
Liaoning Frida Building Technology Co., Ltd. has an annual output of 300000 square meters of light steel structure assembly and decoration integrated building production and research and development project environmental impact report and public participation statement have been completed. According to the relevant requirements of the Measures for Public Participation in Environmental Impact Assessment (Ministry Order No. 4), the relevant contents are now publicized.
2022
04-07
Annual output of 300000 square meters of light steel structure assembly and decoration integrated building production and research and development project environmental impact assessment draft publicity instructions
1. Project Overview (1) Project location: Industrial Road 2, Industrial Park, Taian County, Anshan City, Liaoning Province (2) Nature of the project: reconstruction and expansion
2021
12-24
Annual output of 300000 square meters of light steel structure assembly decoration integrated building production and research and development project environmental impact assessment of the first public explanation
Overview of 1. works (1) Project location: Industrial Road 2, Industrial Park, Taian County, Anshan City, Liaoning Province (2) Nature of the project: reconstruction and expansion
07-12
Phase II construction of Fredda in progress
The second phase of the Furida project is under construction, with a total construction area of 26700 square meters and equipment under procurement. The second phase is expected to invest 41 million yuan in fixed assets. It was put into production on February 20, 2013.
2012
02-07
Liaoning Fu Runde Heavy Industry Co., Ltd was established
Congratulations on the establishment of Liaoning Furunde Heavy Industry Co., Ltd. Anshan Furuida Construction Engineering Co., Ltd. and project experts jointly established Liaoning Furunde Heavy Industry Co., Ltd. Freda Company holds 85% of the shares. The company mainly creatively produces new bridge and gantry crane projects. The new crane can save more than 30% of electric energy in the process of using traditional Chinese cranes of the same level, and is maintenance-free equipment for 20 years. The equipment requires that the headroom of the factory building be 50% of that of traditional cranes of the same level. The welding process is changed to make the self-weight light and the crane wheel pressure greatly reduced. The use of this crane can directly reduce the steel content of building steel structure 3% ~ 8%